Prashant Patel shares his knowledge in achieving NSE for buildings in New Zealand.
Words by Prashant Patel, M.IRHACE
The structure of any building in New Zealand is governed by the Building Act and NZ Building Code B1 – Structure. We have our own NZ Standard 1170 – Structural Design Actions, particularly part 5: 2004 which outlines the Earthquake Actions – New Zealand. The main reason to refer to these standards is to determine the Ultimate Limit State (Eu) and Serviceability Limit State (Es).
When touching on the non-seismic elements (NSE) of a structure system, it falls under NZS 4219:2009
– Seismic Performance of Engineering Systems in Buildings. This standard is for specific design of the NSE of the structure elements. However, it doesn’t cover all types of fire and mechanical services. Such as but not limited to:
1. Fire Sprinkler System
2. Suspended Ceilings
This standard is freely available on the Standards New Zealand website. I strongly recommend all service contractors to read through this standard as it provides some great examples and thresholds regarding seismic bracings.
These are just some of the examples and they have their own standards to comply with the NZBC B1 and the NSE of any structure in New Zealand.
As per NZS 4219:2009, there are two pathways to achieve NSE for any type of building,
1. SPECIFIC DESIGN METHOD
Such designs are drafted by experienced structural engineers such as CPEng as most of them fall under either AS or VM of the NZBC B1. These types of design could have generic approaches on the NSE components from the experience of the registered engineer.
2. NON-SPECIFIC DESIGN METHOD
Such designs could be done by NSE specialists as well as by the building services engineers such as Mechanical Engineer or Fire Engineer. Most of the NSE designs out there are done this way, determining the different parameters of the building and finally calculating the required restraint forces for all of the NSE components in question.
Guidance has been provided by BRANZ on the responsibilities associated with the producer statements. (See table on right.)
Considering the table, a contractor or building services engineer other than a Structure or Seismic NSE engineer, can also supply their own design along with Producer Statement 1 and can get a CPEng seismic engineer to review and supply a Producer Statement 2. Each contractor must issue their own Producer Statement 3 for the services they installed for any given project.
NZS 4219:2009 outlines some rules of thumbs when it comes to the Mechanical Services. Some of the main ones are as follows:
Rigid ductwork, where the hanger length from the top of the duct to the structural support exceeds 200 mm, shall be restrained against seismic forces determined in accordance with this Standard.
Flexible ductwork greater than 1.5 m in length shall be restrained in accordance with this clause.
Ducting not requiring restraint shall be installed with a clearance of 150 mm from hangers and braces for suspended ceiling systems or other adjacent suspended components.
Suspended components that are installed in line with the duct system and have an operating weight greater than 10 kg, such as fans, heat exchangers and humidifiers, shall be supported and laterally braced independently of the duct system.
Registers and grilles shall have positive fixings to the ducting. Ducting between ceiling mounted grilles and rigidly mounted ducting shall be flexible, or movement provision provided. Dampers, louvres and diffusers shall be positively attached to the duct with mechanical fasteners. Duct tape shall not be used to provide mechanical fixing or seismic resistance.
Most of the seismic NSE engineers take up to 10 days to supply the final Producer Statement 4 as well as up to 3-4 week notice for the site inspection. So, please plan ahead for this work to avoid the pressure at the project deadlines.