About CCCANZ

Governance

Our People

Strategic Plan

Appointments

Membership

Buying Power

Standards Library

Find A Company

Business Support

Resources

Consumers

Course Catalogue

Refrigerant Recovery

Training Newsletter

What's On

HVAC&R HUB

HVAC&R South

Wallie Askew

Worldskills

About Irhace

Appointments

Committees

Governance

Our People

Strategic Plan

Membership

Professional Development

Awards

Careers

Find A Professional

Education

Member Login

Training Newsletter

What's On

HVAC&R HUB

HVAC&R South

Wallie Askew

Worldskills

About RLNZ

Our People

Governance

Privacy Policy

Strategic Plan

Approved Filler

New or Renew

Approved Filler

Approved Filler Search

Resources

Consumers

Refrigerant Recovery

Training Newsletter

What's On

HVAC&R HUB

HVAC&R South

Wallie Askew

Worldskills

HVAC&R HUB

BuildNZ

Summit 2027

HVAC&R SOUTH

SouthMACH

HVAC&R WAVE

Join the Wave

Wallie Askew

How to Enter

Rules of Competition

Previous Finalists

Competition judges

WORLDSKILLS

Worldskills NZ

FIND A PROFESSIONAL

PROFESSIONAL DEVELOPMENT

CAREERS IN HVAC&R

FIND A COMPANY

BULLETINS

FACT SHEETS

GUIDELINES

COURSE CATALOGUE

REFRIGERANT RECOVERY

APPROVED FILLER SEARCH

Training Newsletter

MEDIA

INDUSTRY JOURNAL 

MEDIA KIT

INFORMATION

INDUSTRY JOURNAL

TRAINING NEWSLETTER

RESOURCES

CONSUMERS

COURSE CATALOGUE

PROFESSIONAL DEVELOPMENT

STANDARDS LIBRARY

MEMBERSHIP

COMPANY AFFILIATE

COMPANY MEMBER

INDIVIDUAL MEMBER

IRHACE

CAREERS IN HVAC&R

PROFESSIONAL DEVELOPMENT

COURSE CATALOGUE

CCCANZ

BUYING POWER

RESOURCES

STANDARDS

MEMBERSHIP

COMPANY AFFILIATE

COMPANY MEMBER

INDIVIDUAL MEMBER

OUR PEOPLE

AWARDS

APPOINTMENTS

MEMBER LOGIN

MEDIA

INDUSTRY JOURNAL

INDUSTRY DIRECTORY

MEDIA KIT

TRAINING NEWSLETTER

RESOURCES

CONSUMERS

COURSE CATALOGUE

PROFESSIONAL DEVELOPMENT

REFRIGERANT RECOVERY

MEMBERSHIP

COMPANY AFFILIATE

COMPANY MEMBER

INDIVIDUAL MEMBER

Massey University Chiller Replacement

Judd Refrigeration has installed new Daikin equipment at the Hopkirk Research Institute at Massey University’s Turitea campus in Palmerston North

 

It’s a building that supports processes and procedures that are integral to world-class research, with the work completed in the close to 4,000sqm of laboratory and office space focused on achieving and promoting scientific and technological excellence in areas relevant to the health and welfare of pastoral livestock, with an emphasis on infectious diseases endemic to New Zealand that threaten the livelihood of the pastoral sector.

Opened in 2007, a replacement chiller system was needed for the building.

 

The Equipment

Daikin’s EWAH-SRB2 600kW air-cooled chiller has an ultra-low GWP (7) rating and zero ozone depletion potential (ODP) from using R1234ze refrigerant – a green solution for low environmental impact.

With meticulous attention to fine-tuning each facet of operation, the chiller offers high efficiency for unmatched performance and economical operation. The 600kW air-cooled chiller provides an economical means to produce chilled water without the requirement for a cooling tower, avoiding additional system complexity and maintenance.

BacNet BMS interface was integrated into the onboard chiller control to allow for high-level control monitoring and early fault detection by the site’s building management system – there was only low-level monitoring with generic fault outputs on the existing chiller. This new ability for remote control and management reduces long-term running costs.

 

Installation

The installation process to replace the chiller required several considerations including the tenant’s existing operational requirements, particularly areas such as laboratories. The installation was scheduled during the shoulder season as the required cooling demands would be minimal through this period.

Before the start of the installation, trials were conducted by Judd Refrigeration to identify areas of the building that require continuous cooling demand. Once these areas were identified, temporary solutions were provided to meet the tenant’s requirements including installing portable air conditioners and providing a temporary cooling water supply to two autoclaves.

 

Challenges

Installation of the system was originally scheduled during the winter season as the required cooling demands would be minimised through this period. However, due to COVID-19 delivery delays and increasing ambient temperatures, a decision was made to install the chiller on temporary mounts to ensure cooling demands were met.

The crane lift of the chiller onto the third storey of the building was also a challenge. The day the lift was scheduled for had extremely poor weather conditions. It needed to be done at 6am for traffic management controls at the busy university with high staffing numbers and traffic movement. The lift itself required a spreader bar with careful connection points for lifting eyes due to the millimetre-perfect positioning onto the temporary mounts that had been Chemset fixed into place on the plant room concrete plinths.

 

Commissioning

The variation in COVID-19 lockdown restrictions within the different regions of New Zealand was a hurdle to overcome when it came time to commission the chiller.

The Auckland region was in a Level 3 lockdown, where Daikin’s Commissioning Engineer is based and no inter-regional travel was permitted. An essential travel exemption application to the government was lodged and approved to get the commissioning completed.

The commissioning and fine-tuning process was carried out over two days as environmental factors such as low ambient cooling, and the new R1234ze refrigerant properties were taken into account.

The expertise of Judd Refrigeration was utilised through Daikin’s latest technology product offering, giving this award-winning building an upgraded and sustainable chiller system that will benefit the research institute for years to come.

An ultra-low GWP energy efficient and cost-saving performance solution was delivered as well as an improved monitoring system that fits the building’s prominence.

.

Case studies, News

Behind closed doors at New World Te Atatū

The transformation of a former Woolworths into New World Te Atatū called for more than a simple refurbishment. With much of the original building removed, the project combined retained structure with an entirely new supermarket fit-out, including transcritical CO₂ refrigeration, heat recovery and humidity-controlled air conditioning.

Competitions, News

Nominate your 2026 MVC

Competenz has launched the second round of its MVC (Most Valuable Coach) campaign to recognise the bosses, trainers and mentors who act as true game changers for our industry’s apprentices.