About CCCANZ

Governance

Our People

Strategic Plan

Appointments

Membership

Buying Power

Standards Library

Find A Company

Business Support

Resources

Consumers

Course Catalogue

Refrigerant Recovery

Training Newsletter

What's On

HVAC&R HUB

HVAC&R South

Wallie Askew

Worldskills

About Irhace

Appointments

Committees

Governance

Our People

Strategic Plan

Membership

Professional Development

Awards

Careers

Find A Professional

Education

Member Login

Training Newsletter

What's On

HVAC&R HUB

HVAC&R South

Wallie Askew

Worldskills

About RLNZ

Our People

Governance

Privacy Policy

Strategic Plan

Approved Filler

New or Renew

Approved Filler

Approved Filler Search

Resources

Consumers

Refrigerant Recovery

Training Newsletter

What's On

HVAC&R HUB

HVAC&R South

Wallie Askew

Worldskills

HVAC&R HUB

BuildNZ

Summit 2027

HVAC&R SOUTH

SouthMACH

HVAC&R WAVE

Join the Wave

Wallie Askew

How to Enter

Rules of Competition

Previous Finalists

Competition judges

WORLDSKILLS

Worldskills NZ

FIND A PROFESSIONAL

PROFESSIONAL DEVELOPMENT

CAREERS IN HVAC&R

FIND A COMPANY

BULLETINS

FACT SHEETS

GUIDELINES

COURSE CATALOGUE

REFRIGERANT RECOVERY

APPROVED FILLER SEARCH

Training Newsletter

MEDIA

INDUSTRY JOURNAL 

MEDIA KIT

INFORMATION

INDUSTRY JOURNAL

TRAINING NEWSLETTER

RESOURCES

CONSUMERS

COURSE CATALOGUE

PROFESSIONAL DEVELOPMENT

STANDARDS LIBRARY

MEMBERSHIP

COMPANY AFFILIATE

COMPANY MEMBER

INDIVIDUAL MEMBER

IRHACE

CAREERS IN HVAC&R

PROFESSIONAL DEVELOPMENT

COURSE CATALOGUE

CCCANZ

BUYING POWER

RESOURCES

STANDARDS

MEMBERSHIP

COMPANY AFFILIATE

COMPANY MEMBER

INDIVIDUAL MEMBER

OUR PEOPLE

AWARDS

APPOINTMENTS

MEMBER LOGIN

MEDIA

INDUSTRY JOURNAL

INDUSTRY DIRECTORY

MEDIA KIT

TRAINING NEWSLETTER

RESOURCES

CONSUMERS

COURSE CATALOGUE

PROFESSIONAL DEVELOPMENT

REFRIGERANT RECOVERY

MEMBERSHIP

COMPANY AFFILIATE

COMPANY MEMBER

INDIVIDUAL MEMBER

The HVAC&R systems powering Hangar 4

The HVAC&R systems powering Hangar 4

McAlpine Hussmann played a central role in the development of Hangar 4, a landmark project that redefines aviation infrastructure in the Southern Hemisphere.

This cutting-edge facility will be the largest single- span timber arch aircraft hangar in the region, purpose-built to support both wide-bodied aircraft, including the Boeing 777-300 and 787-9, and up to two narrow-bodied aircraft such as the A320 or A321neo simultaneously.

Beyond its scale and engineering ambition, Hangar 4 embodies a commitment to sustainability, functionality and long-term operational efficiency.

SUSTAINABILITY AND INNOVATION

Designed with a targeted Green Star 6 rating, the hangar reflects a strong emphasis on environmental responsibility. From its expansive timber arch structure to its energy-efficient systems, every aspect of Hangar 4 has been engineered to minimise environmental impact while maximising performance.

Key sustainable innovations include:

  • Destratification fans at high level to enhance air circulation, improving occupant comfort while promoting evaporative cooling.
  • Pre-conditioned Air (PCA) ductwork in HDPE SDR17, providing tempered air to aircraft without the need for auxiliary power units, reducing carbon emissions.
  • Mitsubishi Electric’s Hybrid VRF system for the workshops in Hangars 3 and 4, delivering efficient heating and cooling.

ADVANCED SYSTEMS FOR MODERN AVIATION

Supporting Air New Zealand’s operations requires state-of-the-art systems designed for precision, safety and reliability. Hangar 4 integrates a suite of advanced infrastructure, including:

  • Fuel tank exhaust systems featuring Schedule 10 welded 316 stainless steel below-ground pipework, connected to high-efficiency SWSI centrifugal fans.
  • Robust mass air pipework, also in Schedule 10 welded 316 stainless steel, distributing to multiple pit chambers for engine spinning.
  • Two new compressed air plants with extensive pipework reticulation beneath the hangar, supporting operational flexibility.
  • Specialised make-up and exhaust systems for new paint booths.
  • Continuous supply air systems tailored for ETFE cladding performance.

These systems ensure Hangar 4 can meet the complex and evolving needs of aircraft maintenance and operations at scale.

A PARTNERSHIP FOR THE FUTURE

The Hangar 4 project highlights McAlpine Hussmann’s ability to deliver complex, sustainable and highly functional infrastructure that aligns with industry best practice. It also reflects the company’s dedication to supporting Air New Zealand’s growth and operational excellence, ensuring the airline remains well-positioned for the future.

As the largest timber arch aircraft hangar of its kind in the Southern Hemisphere, Hangar 4 is more than an engineering achievement – it is a statement of vision, innovation, and sustainability in aviation infrastructure.

Case studies, News

Behind closed doors at New World Te Atatū

The transformation of a former Woolworths into New World Te Atatū called for more than a simple refurbishment. With much of the original building removed, the project combined retained structure with an entirely new supermarket fit-out, including transcritical CO₂ refrigeration, heat recovery and humidity-controlled air conditioning.

Competitions, News

Nominate your 2026 MVC

Competenz has launched the second round of its MVC (Most Valuable Coach) campaign to recognise the bosses, trainers and mentors who act as true game changers for our industry’s apprentices.