Winter delivers for McDonald’s Upper Hutt
It’s unlikely to see a McDonald’s closed during the day. So how do they manage maintenance when it’s needed?
When McDonald’s Upper Hutt needed updates to their system, the team at Winter Air Conditioning & Electrical completed a fast overnight changeover.
There was a full changeover of the kitchen rooftop package unit, plus a full ductwork upgrade, all while keeping the kitchen operating as normal.
The existing system had been through years of additions and changes, and airflow requirements had shifted. Winter worked with the client to weigh up the true cost of keeping an older unit running, including downtime risk, repairs, and the duct remediation that was needed either way.
Once this was compared to that of a new, larger, more efficient unit, the choice was simple.
Overall, the project included:
- Removing the old package unit and most of the existing ducting;
- Installing new solid duct externally lagged to fit tight trusses and achieve the required airflow;
- Cleaning, treating and repainting the remaining section of duct that couldn’t be removed using appropriate PPE and controls.
- By morning, workers and customers were able to return, with all works completed overnight to minimise disruption.